Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 13525609655

engine machine shop price list

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 13525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

engine machine shop price list
Technical Resource Center – Lindgren-Pitman
Technical Resource Center – Lindgren-Pitman

Lindgren-Pitman. 2615 N.E. 5th Avenue Pompano Beach, Florida 33064 U.S.A.. Call us now: (954) 943-4243 Email: sales@lindgren-pitman.com

Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation

If it contains radio remote control panel; battery power, utility charging specification • For example, Trolley: supply Pressure: 207 barg (absolute pressure); ,Hydraulic, oil flow rate: 50 l/min; Return Oil flow rate: 5 l/min; Drain oil flow rate: 5 l/min. Material Safety Data Sheets (MSDS) • Safety instructions for Material used in Product • Chemical composition of Material used ...

300 solved-problems - SlideShare
300 solved-problems - SlideShare

29/3/2015, · Country Hammer Type Release Mechanism Hammer Efficiency Argentina donut ,cathead, 0.45 Brazil pin weight hand dropped 0.72 China automatic trip 0.60 donut hand dropped 0.55 donut ,cat-head, 0.50 Colombia donut ,cat-head, 0.50 Japan donut Tombi trigger 0.78 - 0.85 donut ,cat-head, + sp. release 0.65 - 0.67 UK automatic trip 0.73 US safety 2-turns on ,cat-head, 0.55 - 0.60 donut 2-turns on ,cat-head, …

Rig 24 National 1625 Drawworks Manual
Rig 24 National 1625 Drawworks Manual

National 1625 ,cathead, manual - ebooks free National 1625 ,Cathead, Manual by 3ea Rig 118 Main Features. DRAWWORKS NATIONAL 55 mounted on make up Manual Documents > Platformusers.net 1,625.24 KB: Draw-works - wikipedia, the free encyclopedia Outboard catheads can be used manually with ropes for various small hoisting jobs around the rig. The

(PPT) BASIC DRILLING TECHNOLOGY | Oyine Belleh - Academia.edu
(PPT) BASIC DRILLING TECHNOLOGY | Oyine Belleh - Academia.edu

The ,hydraulic, or electric brake can control the speed of descent of a loaded travelling block, although it is not capable of stopping the drum completely.• Another of component of the drawworks is the catheads.• The makeup, or spinning, ,cathead, is located on the driller's side of the drawworks and is used to tighten the drill pipe joints.

(PPT) BASIC DRILLING TECHNOLOGY | Oyine Belleh - Academia.edu
(PPT) BASIC DRILLING TECHNOLOGY | Oyine Belleh - Academia.edu

The ,hydraulic, or electric brake can control the speed of descent of a loaded travelling block, although it is not capable of stopping the drum completely.• Another of component of the drawworks is the catheads.• The makeup, or spinning, ,cathead, is located on the driller's side of the drawworks and is used to tighten the drill pipe joints.

Drilling Process
Drilling Process

The ,diagram, shows the values of braking force as a function of rpm of the drawworks shaft. Notice how the electromagnetic brake is also effective at low speeds. 4 POWER CALCULATION WORK = Force x Step POWER= Force x Pooh velocity - Hook Power Ph = P xVe / 75 Where Ph = Hook Power (HP) Ve = Pooh velocity (m/s) P = Weight on Hook (kg)

Drilling Process
Drilling Process

The make up ,cathead, is located beside the driller's console and the break-out ,cathead, is located on the opposite side of the driller's console. The catheads apply the pulling force on the hand tongs connections. - Model 16 Spinning line ,Cathead, - Model 16 Breakout ,Cathead, - Employment scheme

Theory - vsb.cz
Theory - vsb.cz

The backup tong is secured to a stationary point by line or chain. The other is connected to a head that is rotated by the ,cathead, transmission. The pulling force exerted by the ,cathead, provides torque on the tubular by means of the lever arm corresponding to the length of the tong. Two crew men are required to pace and remove these tongs.

Cardwell KB200C - DRILL-QUEST
Cardwell KB200C - DRILL-QUEST

A spool ,cathead, on the operator's side is standard. Optional Hydromatic Brakee, ... KB 200C POWER FLOW ,DIAGRAM, HYDROMATIC BRAKEØ OPTIONAL' ROTARY DRIVE OPTIONAL ALLISON ... MAST ,SPECIFICATIONS Hydraulic, power is employed to raise. extend and lock Cardwell masts.

Name ZJ50D(S102) Make Kerui China Type - ADSO
Name ZJ50D(S102) Make Kerui China Type - ADSO

Catheads spinning/breakout type ,hydraulic, ... Automatic driller type N/A Ezytorque type Yes, ,cathead, Item Description of proposed Equipment Rig Specification . Mast ,Specifications, Make and type Kerui JJ450/45-k Total height (m) 149 ft clear Hight (45.5m) Height from ground level (m) 182 ft(55.5m) Stands ...

238 hc dec05 FC - iiNet
238 hc dec05 FC - iiNet

SPECIFICATIONS, The Castoldi ... special balanced Castoldi ",Cathead," steering nozzle hydraulically actuated. suit up to 150 mm diameter drive shaft flange, or the engine's direct coupling joint. all oil lubricated. - No. ... ,Diagram, showing the Water Powers as a function of boats speed.

Field energy measurements of standard penetration testing
Field energy measurements of standard penetration testing

The data include a range of ,cathead, rope wraps from 1 to 4 turns around the ,cathead,. Earlier studies by Kovacs (1975, 1979, 1981, and 1982) have illustrated significant effect of number of wraps. As a result of studies of number of ,cathead, wraps, the ASTM SPT procedure was revised to standardize testing at two wraps of the ,cathead,. In

Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation

If it contains radio remote control panel; battery power, utility charging specification • For example, Trolley: supply Pressure: 207 barg (absolute pressure); ,Hydraulic, oil flow rate: 50 l/min; Return Oil flow rate: 5 l/min; Drain oil flow rate: 5 l/min. Material Safety Data Sheets (MSDS) • Safety instructions for Material used in Product • Chemical composition of Material used • Contact information incase of …

Chapter 296-32 WAC:
Chapter 296-32 WAC:

A body support that is designed to contain the torso in such a manner that fall arrest forces are distributed over at least the upper thighs, pelvis, chest, and shoulders, with provisions for attaching a lanyard, lifeline, or deceleration devices. These ,specifications, must meet the requirements specified in ANSI Z359.1-2007.

Practice 1/30/15 Flashcards | Quizlet
Practice 1/30/15 Flashcards | Quizlet

Breakout ,Cathead,. A clutching ... the weight placed on the bit, the rotating speed and ,hydraulic, flow information. bottomhole assembly. The lower portion of the drillstring, consisting ... behavior of water mud at ambient (room) temperature and 100-psi differential pressure, usually performed according to ,specifications, set by API, using a ...

300 solved-problems - SlideShare
300 solved-problems - SlideShare

29/3/2015, · From Table-1 below, one boring will be needed for every 300 m2 of footprint area. Since the total footprint area is 30 m x 40 m =1,200 m2 , use four borings. Table-2 provides the minimum depth required for the borings, 5 S0.7 + D = 5 (4)0.7 + 1 = 14 m.

Drilling and Well Completions - ScienceDirect
Drilling and Well Completions - ScienceDirect

1/1/2016, · Additional ,specifications, identified in API 6A include: • Design methods • Product ,specifications, levels/material tractability (PSL 1–4) • Performance requirements (PR1 and PR2) • Welding ,specifications, • Quality control • Repair and remanufacture of equipment. Please refer directly to the latest version of API 6A for any updates and revisions. 4.1.10.3.

Chat Online Inquiry Email

Business cooperation

+86 13525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City